Triple
T13483083
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tana River |
E318420
|
entity |
| Predicate | hasHydropowerDam |
P15311
|
FINISHED |
| Object |
Masinga Dam
Masinga Dam is a major hydroelectric and water storage reservoir in Kenya that forms part of the Tana River hydropower cascade.
|
E1052757
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Masinga Dam | Statement: [Tana River, hasHydropowerDam, Masinga Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Masinga Dam Context triple: [Tana River, hasHydropowerDam, Masinga Dam]
-
A.
Binga Dam
Binga Dam is a major hydroelectric dam in the Philippines that harnesses the flow of the Agno River for power generation and water management.
-
B.
Usuma Dam
Usuma Dam is a major water reservoir near Abuja, Nigeria, that supplies potable water to the capital and serves as a key component of the region’s water infrastructure.
-
C.
Rantembe Dam
Rantembe Dam is a hydroelectric and irrigation dam in Sri Lanka that forms part of the Mahaweli River development scheme.
-
D.
Bariri Dam
Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
-
E.
Wyangala Dam
Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Masinga Dam Triple: [Tana River, hasHydropowerDam, Masinga Dam]
Generated description
Masinga Dam is a major hydroelectric and water storage reservoir in Kenya that forms part of the Tana River hydropower cascade.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Masinga Dam Target entity description: Masinga Dam is a major hydroelectric and water storage reservoir in Kenya that forms part of the Tana River hydropower cascade.
-
A.
Binga Dam
Binga Dam is a major hydroelectric dam in the Philippines that harnesses the flow of the Agno River for power generation and water management.
-
B.
Usuma Dam
Usuma Dam is a major water reservoir near Abuja, Nigeria, that supplies potable water to the capital and serves as a key component of the region’s water infrastructure.
-
C.
Rantembe Dam
Rantembe Dam is a hydroelectric and irrigation dam in Sri Lanka that forms part of the Mahaweli River development scheme.
-
D.
Bariri Dam
Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
-
E.
Wyangala Dam
Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b6bfec819089222715b2e86c8e |
completed | April 9, 2026, 8:06 p.m. |
| NER | Named-entity recognition | batch_69dbaf3868ec8190a6a1803018d4f2d8 |
completed | April 12, 2026, 2:42 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f78ad8903c8190afbf15234a81d657 |
completed | May 3, 2026, 5:50 p.m. |
| NEDg | Description generation | batch_69f78c8d68f081909f5e6b8ab05a3ce2 |
completed | May 3, 2026, 5:57 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69f78d6d74bc8190ad5476a06e8fd8ad |
completed | May 3, 2026, 6:01 p.m. |
Created at: April 9, 2026, 9:42 p.m.