Triple

T13421741
Position Surface form Disambiguated ID Type / Status
Subject Illinois Rebuild Illinois infrastructure program E313374 entity
Predicate instanceOf P0 FINISHED
Object capital plan C11101 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: capital plan
Context triple: [Illinois Rebuild Illinois infrastructure program, instanceOf, capital plan]
  • A. federal capital plan
    A federal capital plan is a strategic, long-term framework that outlines the government’s priorities, timing, and funding for investments in major physical and technological assets to support national policy goals and public services.
  • B. long-term plan
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • C. planning commission
    A planning commission is a governmental or advisory body responsible for reviewing, guiding, and making recommendations on land use, development proposals, and long-term community planning policies.
  • D. plan chosen
    A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
  • E. partition plan
    A partition plan is a detailed layout or strategy that defines how a space, dataset, or resource is divided into distinct sections or segments according to specific criteria or requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806ad0c44819088833ae1ec9e9690 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:39 p.m.