Triple
T13407212
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nambour Sugar Mill site |
E319991
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sugar mill site |
C14209
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sugar mill site Context triple: [Nambour Sugar Mill site, instanceOf, sugar mill site]
-
A.
sugar plantation
A sugar plantation is a large agricultural estate dedicated to cultivating sugarcane (or sugar beets) and processing them into raw sugar, typically relying on intensive labor and monoculture practices.
-
B.
sugar plantation ruins
Sugar plantation ruins are the decayed remains of former sugar-producing estates, including structures like mills, boiling houses, and slave quarters, that reveal the industrial and colonial history of sugar cultivation.
-
C.
industrial site
chosen
An industrial site is a designated area of land developed and equipped with infrastructure and facilities for manufacturing, processing, storage, or other large-scale industrial operations.
-
D.
cotton mill
A cotton mill is an industrial facility where raw cotton is processed, spun, and often woven into yarn or fabric using mechanized equipment.
-
E.
sawmill
A sawmill is an industrial facility where logs are processed and cut into lumber and other wood products using mechanized saws and related equipment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b943cc8190b6af624d385d7e12 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:35 p.m.