Triple
T13388987
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maxim Integrated |
E319521
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | analog and mixed-signal semiconductor company |
C3679
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: analog and mixed-signal semiconductor company Context triple: [Maxim Integrated, instanceOf, analog and mixed-signal semiconductor company]
-
A.
Fabless semiconductor company
chosen
A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
-
B.
electronic design automation company
An electronic design automation company develops and provides software tools and services that enable engineers to design, simulate, verify, and optimize electronic systems and integrated circuits.
-
C.
microprocessor company
A microprocessor company is an organization that designs, manufactures, and markets central processing units and related semiconductor components for use in computers and electronic devices.
-
D.
analog integrated circuit
An analog integrated circuit is an electronic device that processes continuous-time, continuously variable signals using interconnected analog components such as amplifiers, resistors, capacitors, and transistors on a single semiconductor chip.
-
E.
integrated circuit technology
Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b886bc8190b676e7768b8e01c5 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:34 p.m.