Triple

T13388987
Position Surface form Disambiguated ID Type / Status
Subject Maxim Integrated E319521 entity
Predicate instanceOf P0 FINISHED
Object analog and mixed-signal semiconductor company C3679 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: analog and mixed-signal semiconductor company
Context triple: [Maxim Integrated, instanceOf, analog and mixed-signal semiconductor company]
  • A. Fabless semiconductor company chosen
    A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
  • B. electronic design automation company
    An electronic design automation company develops and provides software tools and services that enable engineers to design, simulate, verify, and optimize electronic systems and integrated circuits.
  • C. microprocessor company
    A microprocessor company is an organization that designs, manufactures, and markets central processing units and related semiconductor components for use in computers and electronic devices.
  • D. analog integrated circuit
    An analog integrated circuit is an electronic device that processes continuous-time, continuously variable signals using interconnected analog components such as amplifiers, resistors, capacitors, and transistors on a single semiconductor chip.
  • E. integrated circuit technology
    Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b886bc8190b676e7768b8e01c5 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:34 p.m.