Triple

T13388221
Position Surface form Disambiguated ID Type / Status
Subject The Lance E319500 entity
Predicate powerplant P9904 FINISHED
Object Svenska Flygmotor RM5 E319496 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Svenska Flygmotor RM5 | Statement: [The Lance, powerplant, Svenska Flygmotor RM5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Svenska Flygmotor RM5
Context triple: [The Lance, powerplant, Svenska Flygmotor RM5]
  • A. Svenska Flygmotor RM5 chosen
    The Svenska Flygmotor RM5 is a Swedish-built turbojet engine, produced under license to power the Saab 32 Lansen attack aircraft.
  • B. Volvo Flygmotor RM6C turbojet
    The Volvo Flygmotor RM6C is a Swedish-built, afterburning turbojet engine derived from the Rolls-Royce Avon and used to power high-performance fighter aircraft.
  • C. Volvo RM8
    The Volvo RM8 is a Swedish afterburning turbofan jet engine developed from the Pratt & Whitney JT8D to power the Saab 37 Viggen fighter aircraft.
  • D. Saab 105
    The Saab 105 is a Swedish twin-engine jet trainer and light attack aircraft introduced in the 1960s and used primarily by the Swedish Air Force.
  • E. Volvo RM9 turbojet
    The Volvo RM9 turbojet is a Swedish-built jet engine derived from the French Turbomeca Marboré, used to power the Saab 105 military trainer and light attack aircraft.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b886bc8190b676e7768b8e01c5 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69dba0d3a40081909ba49556130ad0e7 completed April 12, 2026, 1:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69f7306df34c81909f2ad5b753b7fb7f completed May 3, 2026, 11:24 a.m.
Created at: April 9, 2026, 9:34 p.m.