Triple

T13386957
Position Surface form Disambiguated ID Type / Status
Subject Stevenson Expressway (I-55) access nearby E319468 entity
Predicate instanceOf P0 FINISHED
Object highway access point cluster C32940 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: highway access point cluster
Context triple: [Stevenson Expressway (I-55) access nearby, instanceOf, highway access point cluster]
  • A. highway approach route
    A highway approach route is a roadway segment or path that guides vehicles from local or arterial roads onto a highway, facilitating safe and efficient merging into higher-speed traffic.
  • B. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • C. motorway service area
    A motorway service area is a designated roadside facility along a motorway that provides drivers and passengers with services such as fuel, food, restrooms, parking, and rest areas.
  • D. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • E. high-occupancy toll lanes
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b886bc8190b676e7768b8e01c5 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:34 p.m.