Triple

T13386956
Position Surface form Disambiguated ID Type / Status
Subject Stevenson Expressway (I-55) access nearby E319468 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure feature C24341 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation infrastructure feature
Context triple: [Stevenson Expressway (I-55) access nearby, instanceOf, transportation infrastructure feature]
  • A. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. road transport node chosen
    A road transport node is a specific location within a road network where vehicles and travelers converge, diverge, or transfer, such as intersections, terminals, or hubs.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b886bc8190b676e7768b8e01c5 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:34 p.m.