Triple

T13383610
Position Surface form Disambiguated ID Type / Status
Subject Hahndorf E319379 entity
Predicate nearHighway P3561 FINISHED
Object South Eastern Freeway E489400 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Eastern Freeway | Statement: [Hahndorf, nearHighway, South Eastern Freeway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Eastern Freeway
Context triple: [Hahndorf, nearHighway, South Eastern Freeway]
  • A. South Eastern Freeway chosen
    The South Eastern Freeway is a major Australian freeway in South Australia that links Adelaide to the Murray Bridge region and forms a key part of the route toward Melbourne.
  • B. Tullamarine Freeway
    Tullamarine Freeway is a major urban freeway in Melbourne, Australia, connecting the city to Melbourne Airport and the northwestern suburbs.
  • C. Monash Freeway
    Monash Freeway is a major urban freeway in Melbourne, Australia, forming a key east–west transport corridor through the city and its southeastern suburbs.
  • D. Mitchell Freeway
    Mitchell Freeway is a major north–south urban freeway in Perth, Western Australia, serving as a key route connecting the city center with its northern suburbs.
  • E. Pacific Motorway
    The Pacific Motorway is a major Australian highway that runs along the east coast, linking Brisbane with the New South Wales border and serving as a key route for commuter and freight traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b886bc8190b676e7768b8e01c5 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69dadce80158819082156eaeaeda3bd8 completed April 11, 2026, 11:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe64e2991c81908f474fe07a6ba10a completed May 8, 2026, 10:34 p.m.
Created at: April 9, 2026, 9:33 p.m.