Triple

T13369368
Position Surface form Disambiguated ID Type / Status
Subject Sottoceneri E319022 entity
Predicate transportCorridor P3034 FINISHED
Object Gotthard corridor E162360 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gotthard corridor | Statement: [Sottoceneri, transportCorridor, Gotthard corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gotthard corridor
Context triple: [Sottoceneri, transportCorridor, Gotthard corridor]
  • A. Gotthard route chosen
    The Gotthard route is a major north–south trans-Alpine transport corridor in Switzerland, linking central Europe with Italy via road and rail tunnels through the Gotthard massif.
  • B. Lötschberg Tunnel
    The Lötschberg Tunnel is a major Swiss railway tunnel through the Bernese Alps that provides a key north–south transit route between the cantons of Bern and Valais.
  • C. Gotthard
    Gotthard is a masculine given name of Germanic origin, historically borne by several notable figures including military leaders and saints.
  • D. Gotthard
    Gotthard is a Swiss hard rock band known for its melodic sound and successful albums across Europe.
  • E. Simplon Tunnel
    The Simplon Tunnel is a major railway tunnel beneath the Alps connecting Switzerland and Italy, historically significant as one of the longest and most important transalpine rail routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b7bbac8190b85278c87fa7aff3 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69dadcd79184819088948cd38d10a4a5 completed April 11, 2026, 11:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69f7397f098c8190a2062d8c1a74d28f completed May 3, 2026, 12:03 p.m.
Created at: April 9, 2026, 9:33 p.m.