Triple

T13364974
Position Surface form Disambiguated ID Type / Status
Subject North Dam E318914 entity
Predicate locatedOn P40 FINISHED
Object Columbia Basin Project main reservoir system LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbia Basin Project main reservoir system | Statement: [North Dam, locatedOn, Columbia Basin Project main reservoir system]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b7bbac8190b85278c87fa7aff3 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69da628c71ac81908cfa36342077766e completed April 11, 2026, 3:02 p.m.
Created at: April 9, 2026, 9:32 p.m.