Triple
T13356976
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barlow Road corridor |
E318717
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | heritage travel route |
C19666
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: heritage travel route Context triple: [Barlow Road corridor, instanceOf, heritage travel route]
-
A.
cultural heritage route
chosen
A cultural heritage route is a planned path or itinerary that connects sites, landscapes, and traditions of historical, artistic, or social significance to showcase and preserve a community’s or region’s cultural legacy.
-
B.
tourist route network
A tourist route network is an interconnected system of paths, attractions, and services designed to guide visitors efficiently and enjoyably through a region’s key points of interest.
-
C.
ancient route listing
An ancient route listing is a documented catalog of historical travel paths, roads, or trade routes, often detailing their locations, connections, and significance in past civilizations.
-
D.
ancient trade route
An ancient trade route is a historically established pathway or network used for the long-distance exchange of goods, ideas, cultures, and technologies between regions and civilizations.
-
E.
self-guided tour route
A self-guided tour route is a predefined path or itinerary that visitors follow independently, using provided materials or digital tools for information and navigation without a live guide.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b7bbac8190b85278c87fa7aff3 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:32 p.m.