Triple
T13355395
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lech River weir and terraces |
E318678
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river weir |
C32885
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river weir Context triple: [Lech River weir and terraces, instanceOf, river weir]
-
A.
Dam
A dam is a large engineered barrier built across a waterway to control water flow, create reservoirs, and support purposes such as water supply, flood control, irrigation, and power generation.
-
B.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
C.
lock and dam structure
A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
-
D.
embankment dam
An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
-
E.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b7bbac8190b85278c87fa7aff3 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:32 p.m.