Triple

T13352750
Position Surface form Disambiguated ID Type / Status
Subject Ankara commuter rail (Başkentray) E318108 entity
Predicate shortName P43 FINISHED
Object Başkentray E318108 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Başkentray | Statement: [Ankara commuter rail (Başkentray), shortName, Başkentray]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Başkentray
Context triple: [Ankara commuter rail (Başkentray), shortName, Başkentray]
  • A. Şehir Hatları
    Şehir Hatları is Istanbul’s main public ferry company, running iconic commuter and tourist boat services across the Bosphorus and surrounding waterways.
  • B. Ankara Metro
    Ankara Metro is the rapid transit system serving Turkey's capital city, providing urban rail transportation across Ankara and its surrounding districts.
  • C. Istanbul Metro
    The Istanbul Metro is a rapid transit system serving Istanbul, Turkey, connecting key districts and transport hubs across the city.
  • D. Ankara commuter rail (Başkentray) chosen
    Ankara commuter rail (Başkentray) is a suburban rail system serving the Ankara metropolitan area, providing frequent, high-capacity passenger service along key east–west corridors.
  • E. Batıkent station
    Batıkent station is a major Ankara Metro station serving the Batıkent district and functioning as a key hub in the city's rapid transit network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b5a3c08190b42c267fb092f98a completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99e8d520881908aa23c7102b72b72 completed April 11, 2026, 1:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69f72675c87c8190b26991b55092c444 completed May 3, 2026, 10:41 a.m.
Created at: April 9, 2026, 9:32 p.m.