Triple
T13349686
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | FLOW-MATIC |
E318038
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | data processing language |
C1703
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: data processing language Context triple: [FLOW-MATIC, instanceOf, data processing language]
-
A.
data transformation language
A data transformation language is a specialized programming or query language designed to define, manipulate, and convert data from one structure or format into another.
-
B.
data processing platform
A data processing platform is an integrated system that ingests, transforms, analyzes, and manages data at scale to enable efficient, reliable, and repeatable data-driven operations and insights.
-
C.
data processing capability
Data processing capability is the capacity of a system to efficiently collect, transform, analyze, and output data to support specific tasks or decision-making processes.
-
D.
programming language
chosen
A programming language is a formal system of syntax and semantics that allows humans to write instructions a computer can execute to perform specific tasks or solve problems.
-
E.
data engineering tool
A data engineering tool is a software solution that enables the collection, transformation, orchestration, and management of data pipelines to ensure reliable, scalable, and efficient data processing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b5a3c08190b42c267fb092f98a |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:31 p.m.