Triple
T13336991
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ADNOC Onshore |
E317720
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | upstream subsidiary |
C13398
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: upstream subsidiary Context triple: [ADNOC Onshore, instanceOf, upstream subsidiary]
-
A.
subsidiary business
chosen
A subsidiary business is a company that is controlled by another, typically larger, parent company through ownership of a majority of its voting shares.
-
B.
subordinate organization
A subordinate organization is an entity that operates under the authority, control, or oversight of a higher-level organization, carrying out specific functions or responsibilities delegated to it.
-
C.
subsidiary summit
A subsidiary summit is a secondary peak on a mountain that is distinct yet connected to the main summit, typically lower in elevation and often separated by a saddle or ridge.
-
D.
subsidiary brand
A subsidiary brand is a distinct brand owned and controlled by a parent company, operating under its own identity while leveraging the resources and strategic direction of the corporate owner.
-
E.
subordinate office
A subordinate office is an administrative unit that operates under the authority and direction of a higher-level office, carrying out delegated tasks and supporting its functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b5a3c08190b42c267fb092f98a |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:31 p.m.