Triple

T13334850
Position Surface form Disambiguated ID Type / Status
Subject The Queen’s Terminal E317661 entity
Predicate partOfProject P10 FINISHED
Object Heathrow Airport modernisation programme E438836 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Heathrow Airport modernisation programme | Statement: [The Queen’s Terminal, partOfProject, Heathrow Airport modernisation programme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Heathrow Airport modernisation programme
Context triple: [The Queen’s Terminal, partOfProject, Heathrow Airport modernisation programme]
  • A. Heathrow Airport expansion projects chosen
    Heathrow Airport expansion projects are a series of large-scale infrastructure and capacity enhancement initiatives at London’s Heathrow Airport, including new runways, terminals, and related facilities to accommodate growing air traffic demand.
  • B. Heathrow Terminal 5
    Heathrow Terminal 5 is a major passenger terminal at London Heathrow Airport, primarily serving British Airways and known for its modern design and large capacity.
  • C. Heathrow Terminal 4
    Heathrow Terminal 4 is one of the passenger terminals at London Heathrow Airport, serving various international and domestic flights and connected to central London by rail and other transport links.
  • D. Heathrow Terminal 3
    Heathrow Terminal 3 is one of the main passenger terminals at London Heathrow Airport, primarily handling long-haul international flights and serving as a hub for several major global airlines.
  • E. Heathrow Airport rail network
    The Heathrow Airport rail network is the integrated system of rail and metro services that connect Heathrow’s terminals with central London and the wider UK rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b5a3c08190b42c267fb092f98a completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99cff44e08190b9583baf0b626e42 completed April 11, 2026, 12:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f71f39f298819088d79cda3ac2b375 completed May 3, 2026, 10:11 a.m.
Created at: April 9, 2026, 9:30 p.m.