Triple

T13334714
Position Surface form Disambiguated ID Type / Status
Subject LAX north airfield operations E317659 entity
Predicate instanceOf P0 FINISHED
Object airport airfield operations C4129 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: airport airfield operations
Context triple: [LAX north airfield operations, instanceOf, airport airfield operations]
  • A. airport runway
    An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
  • B. airfield
    An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
  • C. airport system chosen
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • D. airport parking
    Airport parking is a designated area or facility where travelers temporarily leave their vehicles while they use air transportation services.
  • E. airport authority
    An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b5a3c08190b42c267fb092f98a completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:30 p.m.