Triple

T13332493
Position Surface form Disambiguated ID Type / Status
Subject Storm Lake, Iowa E317605 entity
Predicate transportInfrastructure P1777 FINISHED
Object Iowa Highway 7 E594704 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iowa Highway 7 | Statement: [Storm Lake, Iowa, transportInfrastructure, Iowa Highway 7]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Iowa Highway 7
Context triple: [Storm Lake, Iowa, transportInfrastructure, Iowa Highway 7]
  • A. Iowa Highway 7 chosen
    Iowa Highway 7 is a former state highway in northwestern Iowa that once connected the Sioux City area to the Fort Dodge region.
  • B. Iowa Highway 70
    Iowa Highway 70 is a state highway in eastern Iowa that runs north–south through Muscatine County, connecting local communities to the broader state road network.
  • C. Iowa Highway 71
    Iowa Highway 71 is a primary north–south state highway in Iowa that runs through the western part of the state, connecting several rural communities and major routes.
  • D. Iowa Highway 78
    Iowa Highway 78 is an east–west state highway in southeastern Iowa that connects several small rural communities and links with multiple primary routes.
  • E. Iowa Highway 75
    Iowa Highway 75 is a primary north–south state highway in northwestern Iowa that serves as a key route through communities such as Rock Valley and connects to major regional corridors.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b4d62c81908d4ced1665414be5 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d9992fffa0819086610ae3bed2e2f9 completed April 11, 2026, 12:43 a.m.
NED1 Entity disambiguation (via context triple) batch_69fd3237ccf88190974ff1a49c3a874b completed May 8, 2026, 12:45 a.m.
Created at: April 9, 2026, 9:30 p.m.