Triple
T13326735
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Naval Environmental Training Program |
E317459
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Canadian naval course |
C32235
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Canadian naval course Context triple: [Naval Environmental Training Program, instanceOf, Canadian naval course]
-
A.
naval cadet organisation
A naval cadet organisation is a structured youth program that provides maritime-themed training, discipline, and leadership development to prepare young people for potential careers or roles in naval and maritime services.
-
B.
Royal Canadian Navy shore establishment
A Royal Canadian Navy shore establishment is a land-based facility that supports naval operations through administration, training, logistics, maintenance, and other essential services.
-
C.
Royal Canadian Navy formation
A Royal Canadian Navy formation is an organized operational grouping of naval units, personnel, and resources structured under a unified command to conduct maritime missions and support national defense objectives.
-
D.
Royal Canadian Navy base
A Royal Canadian Navy base is a military installation that supports the operations, training, logistics, and administration of Canada’s naval forces and their ships, submarines, and personnel.
-
E.
maritime training operation
chosen
A maritime training operation is a coordinated program of exercises, instruction, and simulations conducted at sea or in maritime environments to develop and assess the skills, safety practices, and operational readiness of maritime personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b4d62c81908d4ced1665414be5 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:30 p.m.