Triple

T13318799
Position Surface form Disambiguated ID Type / Status
Subject Cat 6A E317261 entity
Predicate followsStandard P1587 FINISHED
Object TIA-568-C.2 E523131 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TIA-568-C.2 | Statement: [Cat 6A, followsStandard, TIA-568-C.2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TIA-568-C.2
Context triple: [Cat 6A, followsStandard, TIA-568-C.2]
  • A. TIA-569
    TIA-569 is a Telecommunications Industry Association standard that specifies pathways and spaces design requirements for commercial building telecommunications infrastructure.
  • B. TIA-568 chosen
    TIA-568 is a widely adopted commercial building telecommunications cabling standard that defines structured cabling systems for data and voice networks.
  • C. TIA-606
    TIA-606 is a Telecommunications Industry Association standard that defines guidelines for the administration and labeling of telecommunications infrastructure in commercial buildings.
  • D. TIA-607
    TIA-607 is a Telecommunications Industry Association standard that defines requirements for telecommunications grounding and bonding in commercial buildings and data centers.
  • E. TIA-942
    TIA-942 is a widely recognized data center infrastructure standard that defines requirements and best practices for the design, cabling, and operation of reliable and scalable data centers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b4d62c81908d4ced1665414be5 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d990faa95481908a7fd297959c062e completed April 11, 2026, 12:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69f716ee695c81909ffeeb0901ee66c1 completed May 3, 2026, 9:35 a.m.
Created at: April 9, 2026, 9:29 p.m.