Triple
T13318796
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cat 6A |
E317261
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Category 6 augmented cable |
C32815
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Category 6 augmented cable Context triple: [Cat 6A, instanceOf, Category 6 augmented cable]
-
A.
T11 standard
T11 standard is a conceptual classification defining a specific set of technical, performance, or safety requirements that systems or components must meet to ensure compatibility and consistent operation within a given domain.
-
B.
network connector
A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
-
C.
corsair
A corsair is a daring seafaring adventurer who combines the roles of privateer, pirate, and skilled naval combatant, often operating under a commission to raid enemy ships for profit.
-
D.
HDMI feature
An HDMI feature is a specific capability or enhancement supported by an HDMI interface—such as audio return, Ethernet over HDMI, or high dynamic range—that defines how audio, video, and data are transmitted and experienced between connected devices.
-
E.
Fibre Channel protocol
Fibre Channel protocol is a high-speed network communication protocol primarily used to connect computer data storage to servers in storage area networks (SANs), providing reliable, lossless, and low-latency data transfer.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b4d62c81908d4ced1665414be5 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:29 p.m.