Triple

T1331811
Position Surface form Disambiguated ID Type / Status
Subject A12 road E28658 entity
Predicate connectsTo P845 FINISHED
Object A14 road E40867 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A14 road | Statement: [A12 road, connectsTo, A14 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A14 road
Context triple: [A12 road, connectsTo, A14 road]
  • A. A14 road chosen
    The A14 road is a major trunk route in England that links the Midlands to the East Coast, serving as a key freight and commuter corridor including through Cambridgeshire.
  • B. A15 road
    The A15 road is a major north–south route in eastern England that connects Peterborough to Hull, passing through Lincoln and serving as an important regional transport corridor.
  • C. A13 road
    The A13 road is a major east–west route in southern England connecting central London with the Thames Gateway and Essex.
  • D. A12 road
    The A12 road is a major trunk route in eastern England that connects London with coastal towns in Essex and Suffolk before continuing toward Norfolk.
  • E. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498561a508190a3e1bc137c2b866a completed March 1, 2026, 7:49 p.m.
NER Named-entity recognition batch_69a4c1c5f86c819098e98b046968954a completed March 1, 2026, 10:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69b44eb4706c8190870d99abc140973d completed March 13, 2026, 5:51 p.m.
Created at: March 1, 2026, 7:55 p.m.