Triple

T13300224
Position Surface form Disambiguated ID Type / Status
Subject Arsenal Stadium E316790 entity
Predicate partiallyPreservedElement P83097 FINISHED
Object East Stand façade E313911 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: East Stand façade | Statement: [Arsenal Stadium, partiallyPreservedElement, East Stand façade]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: East Stand façade
Context triple: [Arsenal Stadium, partiallyPreservedElement, East Stand façade]
  • A. East Stand facade chosen
    The East Stand facade is the iconic Art Deco exterior of Arsenal’s former Highbury stadium, preserved as a historic architectural feature within the modern residential development on the site.
  • B. South Front
    South Front is the grand, architecturally prominent main façade of Stowe House, overlooking its formal gardens and landscape.
  • C. East Stand
    The East Stand is a major spectator stand at Elland Road stadium, home of Leeds United Football Club.
  • D. East Stand
    The East Stand is one of the main spectator stands at Old Trafford stadium, providing seating and facilities for fans watching Manchester United home matches.
  • E. East Stand
    East Stand is a spectator seating section within Parc y Scarlets stadium, providing views of the pitch for rugby and other events.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partiallyPreservedElement
Context triple: [Arsenal Stadium, partiallyPreservedElement, East Stand façade]
  • A. partiallyPreserved
    Indicates that the referenced entity or object is only incompletely intact, with some parts missing, damaged, or lost while others remain.
  • B. partiallyPreservedThrough
    Indicates that something is not fully intact but has been maintained or conserved to some extent by or via another entity or medium.
  • C. partlyPreservedAs chosen
    Indicates that an entity is only partially preserved or remains in incomplete form within another entity or context.
  • D. partiallyRestored
    Indicates that an entity has been brought back toward a previous or original state, but the restoration is incomplete or only partially achieved.
  • E. preservesFragmentsOf
    Indicates that one entity maintains, protects, or keeps intact partial remains or pieces of another entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b40ab4819094adf6c374f4811a completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99cfdc9388190af1fdd3cd4717bd8 completed April 11, 2026, 12:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f716df8c2c8190bd17b47848546271 completed May 3, 2026, 9:35 a.m.
PD Predicate disambiguation batch_69d98f6893708190aeebf4c47386cff7 completed April 11, 2026, 12:01 a.m.
Created at: April 9, 2026, 9:28 p.m.