Triple

T13296157
Position Surface form Disambiguated ID Type / Status
Subject Vistula basin E316687 entity
Predicate tributary P415 FINISHED
Object Pilica River E150974 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pilica River | Statement: [Vistula basin, tributary, Pilica River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pilica River
Context triple: [Vistula basin, tributary, Pilica River]
  • A. Pilica River chosen
    The Pilica River is a significant river in central Poland known for its natural landscapes, reservoirs, and role in regional recreation and ecology.
  • B. Piva River
    The Piva River is a striking turquoise waterway in northwestern Montenegro, renowned for its deep canyon, hydroelectric dam, and scenic role within the Durmitor mountain region.
  • C. Novčica River
    The Novčica River is a small river in the Lika region of Croatia that flows through the town of Gospić before joining the Lika River.
  • D. Ribnica River
    The Ribnica River is a small watercourse in Montenegro that flows through the capital city of Podgorica, where it is spanned by the historic Ribnica Bridge.
  • E. Morača River
    The Morača River is a major river in Montenegro that flows through the capital city of Podgorica before emptying into Lake Skadar.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b40ab4819094adf6c374f4811a completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99079c8508190b6208db9affcbc0e completed April 11, 2026, 12:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69f78acfd0e88190954533a7f282d83a completed May 3, 2026, 5:50 p.m.
Created at: April 9, 2026, 9:28 p.m.