Triple

T13282055
Position Surface form Disambiguated ID Type / Status
Subject A331 road E316345 entity
Predicate connectsTo P845 FINISHED
Object M3 motorway E17362 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M3 motorway | Statement: [A331 road, connectsTo, M3 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M3 motorway
Context triple: [A331 road, connectsTo, M3 motorway]
  • A. M3 motorway chosen
    The M3 motorway is a major road in southern England that connects London to Southampton, passing through counties including Surrey and Hampshire.
  • B. M3 motorway
    The M3 motorway is a major Irish highway linking Dublin with the northwest region, notably serving towns such as Navan in County Meath.
  • C. M2 motorway
    The M2 motorway is a major dual carriageway in Northern Ireland that connects Belfast with the northern towns and serves as a key commuter and regional transport route.
  • D. M2 motorway
    The M2 motorway is a major road in southeast England that connects the outskirts of London with the north coast of Kent, providing a key route towards the Channel ports.
  • E. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b349908190a9a61dd9323bf153 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d9904507588190a303686d176ec3e1 completed April 11, 2026, 12:05 a.m.
NED1 Entity disambiguation (via context triple) batch_6a014132570081909fab220c002c2f10 completed May 11, 2026, 2:38 a.m.
Created at: April 9, 2026, 9:27 p.m.