Triple

T13266004
Position Surface form Disambiguated ID Type / Status
Subject Linha de Guimarães E315925 entity
Predicate instanceOf P0 FINISHED
Object railway infrastructure in Portugal C2980 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway infrastructure in Portugal
Context triple: [Linha de Guimarães, instanceOf, railway infrastructure in Portugal]
  • A. railway line in Portugal chosen
    A railway line in Portugal is a defined rail corridor within the Portuguese rail network, consisting of tracks, infrastructure, and associated facilities that support train operations between specified locations.
  • B. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • C. railway portal
    A railway portal is a structural entrance or gateway, typically at the mouth of a tunnel or major rail facility, that marks the transition between open track and enclosed or specialized railway infrastructure.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1d9ac8190852c5571d5bd5f0f completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:25 p.m.