Triple
T13256658
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | crawlerway to Launch Pad 39A |
E315675
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | spaceport facility component |
C32735
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: spaceport facility component Context triple: [crawlerway to Launch Pad 39A, instanceOf, spaceport facility component]
-
A.
spaceport facility
A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
-
B.
space launch facility
A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
-
C.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
-
D.
spaceport network
A spaceport network is an interconnected system of spaceports, supporting infrastructure, and operational protocols that collectively enable the efficient launch, landing, servicing, and transfer of spacecraft across multiple locations.
-
E.
spaceflight center
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b1d9ac8190852c5571d5bd5f0f |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:24 p.m.