Triple
T13254762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EPCOT opening-day pavilions |
E315631
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | group of theme park pavilions |
C16926
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: group of theme park pavilions Context triple: [EPCOT opening-day pavilions, instanceOf, group of theme park pavilions]
-
A.
theme park setting
A theme park setting is a large, immersive entertainment environment organized around specific themes, featuring rides, attractions, performances, and themed areas designed to create a cohesive, fantastical experience for visitors.
-
B.
theme park entrance
The theme park entrance is the primary access point where guests transition from the outside world into the park, typically featuring ticketing, security, and iconic visual elements that establish the park’s identity and atmosphere.
-
C.
theme park attraction collection
chosen
A theme park attraction collection is an organized set of rides, shows, and interactive experiences grouped for management, presentation, or thematic cohesion within a park.
-
D.
theme park icon
A theme park icon is a distinctive, often centrally located landmark or symbol that visually represents and embodies the identity, story, and brand of a theme park.
-
E.
theme park show
A theme park show is a live or pre-recorded entertainment performance within a theme park, designed to engage guests through storytelling, music, special effects, and character appearances that enhance the park’s overall themed experience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b1072881909e46bd212259c5f0 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:24 p.m.