Triple

T13252686
Position Surface form Disambiguated ID Type / Status
Subject NASA Manned Spacecraft Center in coordination with USAF E315572 entity
Predicate primaryNASAcenterCurrentName P109164 FINISHED
Object Lyndon B. Johnson Space Center E14335 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lyndon B. Johnson Space Center | Statement: [NASA Manned Spacecraft Center in coordination with USAF, primaryNASAcenterCurrentName, Lyndon B. Johnson Space Center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lyndon B. Johnson Space Center
Context triple: [NASA Manned Spacecraft Center in coordination with USAF, primaryNASAcenterCurrentName, Lyndon B. Johnson Space Center]
  • A. Johnson Space Center chosen
    Johnson Space Center is NASA’s primary hub for human spaceflight operations, astronaut training, and mission control in Houston, Texas.
  • B. Kennedy Space Center
    Kennedy Space Center is NASA’s primary launch complex for human spaceflight and robotic missions, located on Florida’s Atlantic coast.
  • C. Glenn Research Center
    Glenn Research Center is a major NASA research facility in Ohio specializing in aeronautics and space propulsion technologies.
  • D. Marshall Space Flight Center
    Marshall Space Flight Center is a major NASA field center in Huntsville, Alabama, responsible for developing space launch systems, propulsion technologies, and other key spaceflight hardware.
  • E. Kennedy Space Center Launch Control Center
    The Kennedy Space Center Launch Control Center is NASA’s primary facility for managing and overseeing countdown and launch operations for rockets departing from Florida’s Kennedy Space Center.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryNASAcenterCurrentName
Context triple: [NASA Manned Spacecraft Center in coordination with USAF, primaryNASAcenterCurrentName, Lyndon B. Johnson Space Center]
  • A. spaceAgencyHeadquarters
    Indicates that one entity serves as the headquarters location of a particular space agency.
  • B. spaceAgency
    Indicates that one entity is a space agency that operates, manages, or oversees space-related missions, programs, or activities on behalf of the other entity.
  • C. NASAGroup
    Indicates that the entities are associated through membership, affiliation, or grouping within NASA as an organization.
  • D. coordinatesSpaceProgramsFor
    Indicates that one entity organizes, manages, or aligns the space program activities or initiatives of another entity.
  • E. hostSpaceAgency
    Indicates that one entity serves as the space agency that organizes, manages, or officially represents space-related activities for another entity (such as a mission, event, or facility).
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1072881909e46bd212259c5f0 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99cfdc9388190af1fdd3cd4717bd8 completed April 11, 2026, 12:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7305c5f8081908bbe19f2a644acc5 completed May 3, 2026, 11:24 a.m.
PD Predicate disambiguation batch_69d98f60911081909fa346a054f76c9f completed April 11, 2026, 12:01 a.m.
PDg Predicate description generation batch_69d99cf7f9c48190a6a4f452b4a2aefa completed April 11, 2026, 12:59 a.m.
Created at: April 9, 2026, 9:24 p.m.