Triple
T13252680
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NASA Manned Spacecraft Center in coordination with USAF |
E315572
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Gemini program management structure |
C32724
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Gemini program management structure Context triple: [NASA Manned Spacecraft Center in coordination with USAF, instanceOf, Gemini program management structure]
-
A.
spacecraft program
A spacecraft program is an organized, long-term initiative that plans, develops, launches, and operates one or more spacecraft to achieve specific scientific, commercial, or exploratory objectives.
-
B.
NASA spacecraft program
A NASA spacecraft program is an organized initiative that designs, develops, launches, and operates one or more spacecraft to achieve specific scientific, exploratory, or technological objectives in space.
-
C.
spaceflight program phase
A spaceflight program phase is a distinct, time-bounded stage within a space mission or program that groups related objectives, activities, and resources to achieve specific milestones in the overall mission lifecycle.
-
D.
Mars mission engineering activity
Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
-
E.
NASA research program
A NASA research program is an organized, long-term initiative that systematically investigates specific scientific or technological questions to advance space exploration, Earth observation, or aeronautics capabilities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b1072881909e46bd212259c5f0 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:24 p.m.