Triple
T13251151
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | M1 line |
E315531
|
entity |
| Predicate | connectsWithLine |
P845
|
FINISHED |
| Object | M2 line at Kızılay station |
E648166
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M2 line at Kızılay station | Statement: [M1 line, connectsWithLine, M2 line at Kızılay station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: M2 line at Kızılay station Context triple: [M1 line, connectsWithLine, M2 line at Kızılay station]
-
A.
M2 line
The M2 line is a fully automated metro line in Lausanne, Switzerland, running on a steep north–south route that connects the city center with surrounding districts and the lakeshore.
-
B.
M2 line
chosen
The M2 line is a major rapid transit route of the Istanbul Metro system that runs in a north–south direction, connecting key districts on the European side of the city.
-
C.
M2 line
The M2 line is one of the main lines of the Helsinki Metro rapid transit system, serving key districts across the Helsinki metropolitan area.
-
D.
M2 line
The M2 line is a major rapid transit route within the Ankara Metro system in Turkey, serving key districts of the capital city.
-
E.
M22 line
The M22 line is a planned rapid transit route within the Istanbul Metro network intended to expand urban rail connectivity in the city.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b1072881909e46bd212259c5f0 |
completed | April 9, 2026, 8:06 p.m. |
| NER | Named-entity recognition | batch_69d98f73423c8190932a9edac56df383 |
completed | April 11, 2026, 12:01 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f6ff393898819083bdf726466fcbe0 |
completed | May 3, 2026, 7:54 a.m. |
Created at: April 9, 2026, 9:24 p.m.