Triple

T13250385
Position Surface form Disambiguated ID Type / Status
Subject Elmadağ E315509 entity
Predicate locatedOn P40 FINISHED
Object Ankara–Kırıkkale road
The Ankara–Kırıkkale road is a major highway in central Turkey that connects the capital city Ankara with the nearby city of Kırıkkale, serving as an important regional transport corridor.
E1031010 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ankara–Kırıkkale road | Statement: [Elmadağ, locatedOn, Ankara–Kırıkkale road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ankara–Kırıkkale road
Context triple: [Elmadağ, locatedOn, Ankara–Kırıkkale road]
  • A. Milas–Söke road
    The Milas–Söke road is a regional highway in southwestern Turkey that connects the towns of Milas and Söke and provides access to several ancient archaeological sites.
  • B. Malkara–Çanakkale Motorway
    The Malkara–Çanakkale Motorway is a major Turkish highway project in northwestern Turkey that provides a key road connection across the Dardanelles, integrating the region with the national motorway network.
  • C. Ankara–Eskişehir railway
    The Ankara–Eskişehir railway is a major rail line in central Turkey that connects the capital Ankara with the city of Eskişehir, serving as an important corridor for both passenger and freight transport.
  • D. Northern Marmara Motorway
    The Northern Marmara Motorway is a major Turkish highway encircling Istanbul on the northern side, designed to ease traffic congestion and improve transit between Europe and Asia.
  • E. Dumlupınar Boulevard
    Dumlupınar Boulevard is a major arterial road in Ankara, Turkey, connecting central districts and key government areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ankara–Kırıkkale road
Triple: [Elmadağ, locatedOn, Ankara–Kırıkkale road]
Generated description
The Ankara–Kırıkkale road is a major highway in central Turkey that connects the capital city Ankara with the nearby city of Kırıkkale, serving as an important regional transport corridor.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ankara–Kırıkkale road
Target entity description: The Ankara–Kırıkkale road is a major highway in central Turkey that connects the capital city Ankara with the nearby city of Kırıkkale, serving as an important regional transport corridor.
  • A. Milas–Söke road
    The Milas–Söke road is a regional highway in southwestern Turkey that connects the towns of Milas and Söke and provides access to several ancient archaeological sites.
  • B. Malkara–Çanakkale Motorway
    The Malkara–Çanakkale Motorway is a major Turkish highway project in northwestern Turkey that provides a key road connection across the Dardanelles, integrating the region with the national motorway network.
  • C. Ankara–Eskişehir railway
    The Ankara–Eskişehir railway is a major rail line in central Turkey that connects the capital Ankara with the city of Eskişehir, serving as an important corridor for both passenger and freight transport.
  • D. Northern Marmara Motorway
    The Northern Marmara Motorway is a major Turkish highway encircling Istanbul on the northern side, designed to ease traffic congestion and improve transit between Europe and Asia.
  • E. Dumlupınar Boulevard
    Dumlupınar Boulevard is a major arterial road in Ankara, Turkey, connecting central districts and key government areas.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1072881909e46bd212259c5f0 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d98f71c5388190a6e122e14384efd7 completed April 11, 2026, 12:01 a.m.
NED1 Entity disambiguation (via context triple) batch_69f70a3b8ca48190863aff25f12d0e7e completed May 3, 2026, 8:41 a.m.
NEDg Description generation batch_69f70b37ebe081909ed2ae0f42ccad2d completed May 3, 2026, 8:45 a.m.
NED2 Entity disambiguation (via description) batch_69f70ca343f08190b6484f464ed40810 completed May 3, 2026, 8:51 a.m.
Created at: April 9, 2026, 9:24 p.m.