Triple

T13248367
Position Surface form Disambiguated ID Type / Status
Subject A-road E315463 entity
Predicate instanceOf P0 FINISHED
Object highway type C3122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: highway type
Context triple: [A-road, instanceOf, highway type]
  • A. highway chosen
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • B. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • C. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • E. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1072881909e46bd212259c5f0 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:24 p.m.