Triple

T13241672
Position Surface form Disambiguated ID Type / Status
Subject CAN bus E315294 entity
Predicate instanceOf P0 FINISHED
Object fieldbus C15881 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: fieldbus
Context triple: [CAN bus, instanceOf, fieldbus]
  • A. fieldbus system chosen
    A fieldbus system is an industrial network architecture that connects and coordinates field devices such as sensors and actuators with controllers for real-time data exchange and process automation.
  • B. field
    A field is a mathematical structure consisting of a set equipped with two operations, addition and multiplication, that satisfy the usual arithmetic properties including commutativity, associativity, distributivity, and the existence of additive and multiplicative inverses for nonzero elements.
  • C. IEC system
    An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
  • D. field tester
    A field tester is a professional who evaluates products, systems, or processes in real-world environments to verify performance, reliability, and suitability for intended use.
  • E. serial bus interface standard
    A serial bus interface standard defines the electrical, timing, and protocol rules that govern how devices communicate and exchange data over a serial communication bus.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1072881909e46bd212259c5f0 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:23 p.m.