Triple

T13235014
Position Surface form Disambiguated ID Type / Status
Subject Tampico E315121 entity
Predicate locatedOn P40 FINISHED
Object Illinois Route 172 E104964 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 172 | Statement: [Tampico, locatedOn, Illinois Route 172]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Illinois Route 172
Context triple: [Tampico, locatedOn, Illinois Route 172]
  • A. Illinois Route 172 chosen
    Illinois Route 172 is a state highway in northwestern Illinois that serves as a local connector route, including access to the village of Tampico.
  • B. Illinois Route 173
    Illinois Route 173 is an east–west state highway in northern Illinois that runs near the Wisconsin border, connecting several communities across multiple counties.
  • C. Illinois Route 174
    Illinois Route 174 is a former, short state highway designation in Illinois that has since been decommissioned or renumbered.
  • D. Illinois Route 178
    Illinois Route 178 is a state highway in north-central Illinois that primarily serves as the main access route to Starved Rock State Park and nearby recreational areas.
  • E. Illinois Route 176
    Illinois Route 176 is an east–west state highway in northeastern Illinois that connects several communities in McHenry and Lake counties, serving as a key regional arterial route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806affc688190a25b6ccc588e9c72 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d98d36bdf8819099949b1e0e6902d3 completed April 10, 2026, 11:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69fbac754aec8190a5b975c9965eef61 completed May 6, 2026, 9:02 p.m.
Created at: April 9, 2026, 9:22 p.m.