Triple

T13233700
Position Surface form Disambiguated ID Type / Status
Subject Silver Line BRT stations (selected) E315085 entity
Predicate instanceOf P0 FINISHED
Object MBTA Silver Line infrastructure subset C20015 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: MBTA Silver Line infrastructure subset
Context triple: [Silver Line BRT stations (selected), instanceOf, MBTA Silver Line infrastructure subset]
  • A. MBTA Red Line extension project
    The MBTA Red Line extension project is a planned expansion of Boston’s Red Line rapid transit service, extending rail infrastructure and stations to improve regional connectivity, capacity, and access to public transportation.
  • B. MBTA Silver Line station chosen
    An MBTA Silver Line station is a designated stop or terminal along Boston’s Silver Line bus rapid transit routes, providing passenger access to boarding, alighting, and related transit services.
  • C. MBTA Commuter Rail station
    An MBTA Commuter Rail station is a designated passenger facility along the Massachusetts Bay Transportation Authority’s regional rail network where trains stop to allow riders to board, alight, and connect with other modes of transit.
  • D. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • E. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806affc688190a25b6ccc588e9c72 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:22 p.m.