Triple
T13202843
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Camp Film City |
E314282
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | KFOR base |
C32634
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: KFOR base Context triple: [Camp Film City, instanceOf, KFOR base]
-
A.
Iraqi Air Force base
An Iraqi Air Force base is a military airfield in Iraq that supports air operations through facilities for aircraft deployment, maintenance, training, logistics, and command and control.
-
B.
United States Air Force base
A United States Air Force base is a military installation that supports Air Force operations through facilities for aircraft, personnel, training, logistics, and command and control activities.
-
C.
Belgian Air Component base
A Belgian Air Component base is a military airfield or installation in Belgium that supports the operations, training, maintenance, and administration of the Belgian Air Component’s aircraft and personnel.
-
D.
NATO rapid reaction corps headquarters
The NATO Rapid Reaction Corps Headquarters is a high-readiness, multinational command element responsible for planning, coordinating, and directing rapid deployment and operations of NATO land forces in crisis or conflict.
-
E.
Qatar Emiri Air Force base
A Qatar Emiri Air Force base is a military installation that supports the operations, training, maintenance, and deployment of Qatar’s air force aircraft and personnel.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806aee7308190b70a237ba2a6e3e1 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:16 p.m.