Triple
T1319988
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | La Llotja Theatre and Conference Centre in Lleida |
E28194
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | theatre and conference centre |
C6085
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: theatre and conference centre Context triple: [La Llotja Theatre and Conference Centre in Lleida, instanceOf, theatre and conference centre]
-
A.
conference center
A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
-
B.
convention center
A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
-
C.
entertainment complex
An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
-
D.
arts venue
chosen
An arts venue is a dedicated space where artistic performances, exhibitions, or cultural events are presented to the public.
-
E.
amphitheater
An amphitheater is an open or semi-open circular or oval venue with tiered seating surrounding a central performance area, designed to host public events, performances, or gatherings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498532c3481909223b74af2e578df |
completed | March 1, 2026, 7:49 p.m. |
Created at: March 1, 2026, 7:55 p.m.