Triple

T13195907
Position Surface form Disambiguated ID Type / Status
Subject Nantlle Valley slate quarries E314110 entity
Predicate instanceOf P0 FINISHED
Object slate quarry complex C27625 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: slate quarry complex
Context triple: [Nantlle Valley slate quarries, instanceOf, slate quarry complex]
  • A. slate quarry chosen
    A slate quarry is an open excavation site where slate rock is extracted from the earth for use in roofing, flooring, and other construction or decorative applications.
  • B. limestone quarry complex
    A limestone quarry complex is an integrated industrial site where limestone is extracted, processed, and sometimes refined or transported, typically including open pits, crushing facilities, storage areas, and supporting infrastructure.
  • C. tuff quarry
    A tuff quarry is an excavation site where consolidated volcanic ash (tuff) is extracted for use as building stone, aggregate, or raw material in construction and industry.
  • D. granite quarry
    A granite quarry is an open-pit site where granite rock is extracted from the earth through drilling, cutting, and blasting for use in construction and architectural applications.
  • E. sandstone quarry
    A sandstone quarry is an open-pit excavation site where sandstone rock is extracted from the earth for use in construction, architecture, and industrial applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806ae1e08819090d95bfe1538cc17 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:16 p.m.