Triple

T13184400
Position Surface form Disambiguated ID Type / Status
Subject PacifiCorp E313808 entity
Predicate gridRegion P56874 FINISHED
Object Western Electricity Coordinating Council E957110 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Western Electricity Coordinating Council | Statement: [PacifiCorp, gridRegion, Western Electricity Coordinating Council]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Western Electricity Coordinating Council
Context triple: [PacifiCorp, gridRegion, Western Electricity Coordinating Council]
  • A. Western Electricity Coordinating Council chosen
    The Western Electricity Coordinating Council is a regional reliability organization that oversees and coordinates the safe, reliable operation of the bulk electric power system across the Western Interconnection in North America.
  • B. North American Electric Reliability Corporation
    The North American Electric Reliability Corporation (NERC) is a nonprofit regulatory authority responsible for developing and enforcing reliability standards for the bulk power system across North America.
  • C. North Western Electricity Board
    The North Western Electricity Board was a regional public utility in England responsible for distributing and supplying electricity across the northwestern part of the country before industry privatization.
  • D. PJM Interconnection
    PJM Interconnection is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity across parts of the eastern United States, operating one of the world’s largest competitive power markets.
  • E. Federal Electricity Commission
    The Federal Electricity Commission is Mexico’s state-owned electric utility responsible for generating, transmitting, distributing, and marketing electric power across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806ae1e08819090d95bfe1538cc17 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d98c4a0b0081908027bf77442ff5ff completed April 10, 2026, 11:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6f5f307408190afd0df16a417c456 completed May 3, 2026, 7:14 a.m.
Created at: April 9, 2026, 9:15 p.m.