Triple

T13178301
Position Surface form Disambiguated ID Type / Status
Subject Nova Innovation E313657 entity
Predicate instanceOf P0 FINISHED
Object tidal energy company C14998 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tidal energy company
Context triple: [Nova Innovation, instanceOf, tidal energy company]
  • A. wind power company
    A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
  • B. energy solutions company
    An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
  • C. renewable energy developer chosen
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • D. integrated energy company
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • E. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806ae1e08819090d95bfe1538cc17 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:14 p.m.