Triple
T13167825
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Penn Square station |
E312899
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former rapid transit station name |
C2854
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former rapid transit station name Context triple: [Penn Square station, instanceOf, former rapid transit station name]
-
A.
former name of railway station
chosen
A former name of a railway station is a historical designation previously used to identify a specific station before it was officially renamed or rebranded.
-
B.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
C.
former terminus
A former terminus is a station or endpoint that once served as the final stop of a transportation route but no longer holds that status due to network extensions or reconfigurations.
-
D.
former New York City Subway station
A former New York City Subway station is a decommissioned or abandoned stop that once served passengers on the NYC Subway system but is no longer in regular operation.
-
E.
rapid transit station
A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806ac3ee081909b2fd27d060aa974 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:13 p.m.