Triple

T13138100
Position Surface form Disambiguated ID Type / Status
Subject Okertalsperre E312138 entity
Predicate hasPart P35 FINISHED
Object Oker Dam E326297 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oker Dam | Statement: [Okertalsperre, hasPart, Oker Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Oker Dam
Context triple: [Okertalsperre, hasPart, Oker Dam]
  • A. Oker Dam chosen
    Oker Dam is a reservoir dam on the Oker River in the Harz Mountains of Germany, primarily used for water supply, flood control, and hydroelectric power generation.
  • B. LaBarge Dam
    LaBarge Dam is a small hydroengineering structure located on the Thornapple River in Michigan, used primarily for water level control and local recreation.
  • C. Seminoe Dam
    Seminoe Dam is a concrete arch dam in south-central Wyoming that forms Seminoe Reservoir, providing hydroelectric power, irrigation water storage, and recreation along the North Platte River.
  • D. Gerber Dam
    Gerber Dam is an irrigation and water storage dam in southern Oregon that helps regulate water supply for agriculture and flood control within the Klamath Basin.
  • E. Pardee Dam
    Pardee Dam is a concrete arch dam in California that forms Pardee Reservoir, providing water storage, hydroelectric power, and flood control for the Mokelumne River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a9fe888190b081e2d9ea665d6c completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d981b6a4348190b9922ed255759078 completed April 10, 2026, 11:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe6b366470819093a74828e2a85116 completed May 8, 2026, 11:01 p.m.
Created at: April 9, 2026, 9:09 p.m.