Triple

T13136767
Position Surface form Disambiguated ID Type / Status
Subject Omni Loop E312103 entity
Predicate instanceOf P0 FINISHED
Object automated people mover loop C538 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automated people mover loop
Context triple: [Omni Loop, instanceOf, automated people mover loop]
  • A. automated people mover vehicle
    An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
  • B. people mover system chosen
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • C. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • D. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • E. trolley turning loop
    A trolley turning loop is a track configuration that allows a trolley or tram to reverse direction by following a continuous curved path without needing to be turned around manually.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a9fe888190b081e2d9ea665d6c completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:08 p.m.