Triple

T13133718
Position Surface form Disambiguated ID Type / Status
Subject Costa v ENEL E312027 entity
Predicate shortName P43 FINISHED
Object Costa v ENEL E312027 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Costa v ENEL | Statement: [Costa v ENEL, shortName, Costa v ENEL]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Costa v ENEL
Context triple: [Costa v ENEL, shortName, Costa v ENEL]
  • A. Costa v ENEL chosen
    Costa v ENEL is a landmark 1964 judgment of the European Court of Justice that established the primacy of European Union law over conflicting national law.
  • B. ENEL
    ENEL is Italy’s largest multinational electricity and energy company, involved in power generation, distribution, and renewable energy projects worldwide.
  • C. Enel Colombia
    Enel Colombia is a major energy company operating in Colombia, focused on the generation, distribution, and commercialization of electricity, including large-scale hydroelectric projects.
  • D. Endesa
    Endesa is a major Spanish electric utility company and one of the leading energy providers in the Iberian Peninsula and Latin America.
  • E. Tractebel Energia
    Tractebel Energia is a Brazilian electric power generation company known for operating large hydroelectric facilities and other energy assets across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a9fe888190b081e2d9ea665d6c completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d981b3d72c8190b69ae56435a954fa completed April 10, 2026, 11:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6eae08a148190af391d173f25b714 completed May 3, 2026, 6:27 a.m.
Created at: April 9, 2026, 9:08 p.m.