Triple
T13114954
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nassau County road network |
E311069
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public infrastructure system |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public infrastructure system Context triple: [Nassau County road network, instanceOf, public infrastructure system]
-
A.
infrastructure
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
B.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
C.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
internet infrastructure component
An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
-
E.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806a872d08190a329806f8ff30df4 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:06 p.m.