Triple

T13106326
Position Surface form Disambiguated ID Type / Status
Subject FedRAMP Joint Authorization Board Provisional ATO E310852 entity
Predicate instanceOf P0 FINISHED
Object Provisional Authority to Operate C32459 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Provisional Authority to Operate
Context triple: [FedRAMP Joint Authorization Board Provisional ATO, instanceOf, Provisional Authority to Operate]
  • A. DISA component
    A DISA component is a modular element within the Defense Information Systems Agency’s infrastructure that provides specific communication, security, or information services to support Department of Defense operations.
  • B. NRC operating license
    An NRC operating license is a formal authorization issued by the U.S. Nuclear Regulatory Commission permitting a facility or entity to operate a nuclear reactor or related nuclear activity under specified safety, security, and regulatory conditions.
  • C. Emerging Security Challenges Division
    The Emerging Security Challenges Division is a specialized organizational unit focused on identifying, analyzing, and addressing new and evolving threats—such as cyber, hybrid, technological, and non-traditional security risks—to inform policy, strategy, and operational responses.
  • D. operating permit program
    An operating permit program is a regulatory framework that requires facilities to obtain and comply with permits specifying conditions under which they may operate, typically to control environmental, safety, or public health impacts.
  • E. security operation
    Security operation is the coordinated set of processes, technologies, and activities used to detect, prevent, respond to, and recover from security threats to an organization’s assets and operations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a872d08190a329806f8ff30df4 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:05 p.m.