Triple

T13106230
Position Surface form Disambiguated ID Type / Status
Subject GSA Technology Transformation Services E310850 entity
Predicate instanceOf P0 FINISHED
Object technology consulting organization C188 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technology consulting organization
Context triple: [GSA Technology Transformation Services, instanceOf, technology consulting organization]
  • A. consulting organization chosen
    A consulting organization is a professional services entity that provides expert advice, analysis, and solutions to clients to improve their performance, solve specific problems, or achieve strategic objectives.
  • B. technical services organization
    A technical services organization is a specialized entity that provides expert engineering, IT, and other technology-focused support, solutions, and maintenance to help clients design, implement, and operate complex systems.
  • C. technology institution
    A technology institution is an organization dedicated to advancing, teaching, and applying technological knowledge through education, research, and innovation.
  • D. information and communications technology organization
    An information and communications technology organization is an entity that develops, manages, or delivers digital and networked technologies, services, and infrastructure to enable electronic communication, data processing, and information exchange.
  • E. security consulting firm
    A security consulting firm is a professional organization that assesses, designs, and advises on measures to protect an organization’s physical, digital, and operational assets from threats and vulnerabilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a872d08190a329806f8ff30df4 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:05 p.m.