Triple

T13102489
Position Surface form Disambiguated ID Type / Status
Subject Duke Energy (hydropower operations) E310751 entity
Predicate instanceOf P0 FINISHED
Object electric power generation business unit C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric power generation business unit
Context triple: [Duke Energy (hydropower operations), instanceOf, electric power generation business unit]
  • A. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • C. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • D. wholesale energy company
    A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
  • E. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a872d08190a329806f8ff30df4 completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:04 p.m.