Triple
T13095003
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SEA LIFE Manchester |
E310560
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public aquarium attraction |
C3847
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public aquarium attraction Context triple: [SEA LIFE Manchester, instanceOf, public aquarium attraction]
-
A.
public aquarium
chosen
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
-
B.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
C.
aquarium chain
An aquarium chain is a business organization that operates multiple retail or public aquarium locations under a unified brand, offering aquatic animals, supplies, and related services across different geographic areas.
-
D.
water-themed attraction
A water-themed attraction is a recreational venue or feature centered around water-based activities, environments, or spectacles designed for entertainment, relaxation, or adventure.
-
E.
indoor aquarium
An indoor aquarium is a controlled, enclosed environment within a building designed to house and display aquatic life in water-filled tanks for observation, education, and enjoyment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806a733548190989cfd4ce981ca33 |
completed | April 9, 2026, 8:05 p.m. |
Created at: April 9, 2026, 9:03 p.m.